The development of evacuated glazings approaches prototype production. Thus the basis for decision-making for commercial production will be created within approx. a year and a half.
Coordination of all Danish CADDET activities. Mailing of CADDET Newsletters, brochures and similar material. Organization of CADDET register inputs and liasion activities to the CADDET Centre and
The aim of the project was to demonstrate ventilated solar walls in practice, including satisfactory architectural and structural adjustment to a certain building.
The aim of this project was to design and build an apparatus for evacuation and assembly of aerogel glazings up to 60 cm x 60 cm based on the proposed method. The key element of the method is the
The purpose of the project is to produce the technical basis for dimensioning and developing motor/pump systems, so that the total concept is energy-optimized for domestic heating.
Forskningscenter for Elektroteknisk Energiomformning E/F (CETEC)
EFP
1996
1998
One of the results is, that the separation depend not on the gravitational force itself but on the exponent of the square of the peripheral speed of the centrifuge.
The objective of the project was to develop new trawls for the Russian fleet, that would save energy per unit of catch through the application of new designs and modern materials.
The aim is to analyse and evaluate appropriate means of establishing a working interaction between different intelligent components, e.g. for energy management purposes. The interaction between
The main objective of the Task is to promote daylight-conscious building design with the aim of realising energy savings and visual comfort and amenity value of the building.
The bulletin presents a method for calculating the gross energy consumption of a building. The net heat demand for space heating, ventilation and domestic hot water should be calculated. Next
This project takes stock of experiences with often used ventilation systems for new housing with regard to energy efficiency, indoor climate, comfort, operation and maintenance and also assesses the
In accordance with its purposes the research project gives an account of how it is possible in addition to building improvements and presumable low maintenance costs, to achieve energy savings.
The purpose of the project is related to the rebuilding of existing buildings: - To develop an inventory tool for energy related environmental interventions. - To collect environmental life cycle data
New, super-insulating transparent and translucent glazing offers new pespectives for the use of glass in architecture. New facade idioms, spatial and light effects and low energy consumption may be
In the project, the consulting engineering companies Carl Bro A/S and Birch og Krogboe A/S have tested a prototype of SBI's integrated computer system for analyzing the energy and indoor climte
The aim has been to investigate and to develop thermally improved windows based on an evaluation of the energy balance of the window, i.e. the total influence of the window (heat loss and transmitted
In the project detailed programs for calculating the effect of thermal bridges in building envelope constructions have been validated by use of measurements and methods for calculating the total heat