The scope of PV GRID is to address the large potential for stimulating commercial investment in PV in DK. The project purpose is to address identified barriers and assign possible solutions. A central
Feasibility study of an offshore energy storage facility with integrated renewable energy production (wind, wave and solar). Design geometry is verified and total costs estimated. Earning potential in
The purpose of the project is to carry out detailed planning/engineering and part-implementation of an off-grid renewable energy solution for Livø Island. A previous project has - based on e.g. the
The objective of Task 25 is to analyse and further develop the methodology to assess the impact of wind power on power systems. The Task has established an international forum for exchange of
The project has generally aim to support Denmark´s participation in the “IEA Wind Energy R & D Implementing Agreement” in 2013 through participation in the Agreement Steering Committee (“Executive
TotalFlex is a demonstration project that intelligently manages flexible consumption and production. This is done by flex-offers from a technical and commercial VPP, which are traded on a marketplace
NEAS ENERGY A/S
ForskEL
2012
2014
The aim is analyzing, developing and demonstrating a smart grid ready Virtual Power Plant controller that includes the complex challenges of large scale demonstration with demand flexibility
Currently, individual wind turbines can estimate their possible power of during down-regulation. For large offshore wind power plants, the sum of those signals is larger than the possible power of the
Danmarks Tekniske Universitet (DTU)
ForskEL
2012
2014
The purpose is to achieve an energy pay-back time of less than one year for a complete grid-connected installation with polymer solar cells. The project comprises development of polymer solar modules
This project is focusing on the electricity consumption of the agriculture on Samsø. The agricultures/farms are going to be active players in Smart Grids together with other manufacturing industries
Århus Vand og Spildevand
ForskEL
2012
2014
The purpose of the project is to map and assess the potential for a water utility to adapt current operating practices to respond to the needs of a the electricity system through a flexible demand
The overall objective of the project is to develop a cost-efficient Lidar wind sensor to be integrated on individual wind turbine in order to maximize power production and minimize dynamic load on the
The original EUDP grant included support for the Danish participation in Task 41 participation in the 3-year project was more extensive than expected, as Denmark was responsible for Sub Task C
Implementation of 10,600 m2 solar collectors, 19,000 m3 borehole storage and a heat pump to supply the existing combined heat and power plant in Brædstrup, Denmark
The purpose is to develop and demonstrate methods for cableinstallation, which via improved cable
fabrication and installation can reduce costs for installation of array-, infield- and export cables
To develop and demonstrate the value of a yaw control kit for wind turbines, which continuously measures
the wind direction in front of a wind turbine and subsequently turns the turbine almost
To develop and demonstrate a new solar energy prognosis for any location in Northern Europe for the coming 48 hours, based on the
newest DMI forecasts of direct and diffuse solar radiation. ”Solar PV
To develop and test a market based smart city energy management platform using Kalundborg as fullscale
demo. Grid-responsive energy services are aligned with intelligent grid operations and dynamic