The objective of BLATIGUE-2 is to develop fast and efficient fatigue testing methods for large wind turbine blades, to develop smart equipment to excite the blades under such tests and to increase
The purpose of the project is to increase the liability of blades in operation by installing RTZ Solution. Further, the purpose is to reach higher cost efficiency and higher AEP for the wind turbine
Fatigue of fiber rope is crane applications is not well established, why extensive full-scale testing is currently required for using fiber ropes in crane applications. The main objective of this
LERCat enables leading edge roughness (LER) repairs of wind turbine blades at the right time, yielding a 1 bn DKK/year gain across the partners’ turbine fleets. This is achieved by establishing an
The project involves the development and maturement of a drone charging station and a drone system. The combined system should then be capable of conducting autonomous wind turbine inspections and
Managing offshore corrosion is a subject that is heavily regulated and combined with several industry standards that must be followed to ensure the structure integrity of the assets. Yet, whilst, and
The purpose of IDEA is to establish reference site conditions and wind reference wind farm designs for floating wind turbines. The project follows the international IEA project on wind farm design and
The overall objective of this project is to further adapt, improve and expand the existing operational tracking technology that Claviate has developed to cover the entire onshore wind turbine
We aim to demonstrate that a radically new blade technology combining jointed modular blades with advanced tips made with additive manufacturing can enable increased rotor sizes by up to 20% and lead
The project is a part of the international cooperation on wawe power under IEA. The project will exchange information and experiences with wawe energy and asses ocean devices.
The objective is to reach international consensus and establish guidelines on operation of wind farm flow models through a collaborative research work (IEA Task 31). Better understanding and
The Global Wind Atlas provides a new public-domain dataset of wind resources for the whole world, accounting for high resolution effects. Its specifications and accessibility through web tools will
The objective of the project is to demonstrate load reduction potential on tower and foundation of the PP-2B wind turbine concept designed to meet the needs of the existing and emerging offshore winid
This project addresses four specific aeroelastic design challenges of wind turbines through development, demonstration and implementation of new tools and models. The project is carried out in close
To ensure the reliability of large multi megawatt wind turbines, it is essential that the international standards that are used in its design are upgraded. With the objective of providing the right
The goal of the project is to further develop setup in order to erect a prototype tower with hub height of 140 m. This involves refining the design, development of moulds and erection equipment, and
The self-hoisting crane can greatly reduce the cost of service on wind turbines when major components such as gearbox, generator and rotor needs to be replaced. The self-hoisting crane can substitute
The aim of the project is to design highly efficient, low cost and low noise wind turbine blades, thereby making Danish wind turbine blades more competitive in the future wind energy market. The idea