The consortium will improve the energy collectors and energy efficiency on the most weight and cost-efficient wave energy system currently in development. The EUDP project targets the primary CAPEX
Building on the results achieved in a first EUDP project, the purpose of this project is to finalise the development and testing of the technologies needed to produce extra – tall 3D printed wind
Power Curve, the Technical University of Denmark and Statkraft collaborate in order to develop a trailing edge serration product for wind turbine blades that offers increased noise reduction fea-tures
The purpose of the Thunderbolt project is to be able to deliver a fully commercialized service on subscription to the wind energy market after successful project execution, making it possible to
The project is dedicated to enhancing the efficiency and cost-effectiveness of foundation design for offshore structures such as windfarms and energy islands. The envisioned solution involves the
The project allows Floating Power Plant (FPP) to optimise and further develop novel floating wind concepts. The output will be three large demonstration activities and six innovations, including a
Aeromine is a novel, building integrated windenergy system intended to compete with or supplement industrial rooftop solar PV. The EUDP project will improve the understanding of- and demonstrate how
Formålet med projektet er, at have mere pålidelige WTG-vinger i drift med forlænget levetid, sænke OPEX og optimere AEP, gennem anvendelsen af en risikobaseret tilgang. Hvis vingerne kan forblive i
The project deals with the continued operation and development of Wave Star pilot plant in Hanstholm with a focus on increasing the service life and reduce operating and maintenance costs, thus
The objective of Task 25 is to analyse and further develop the methodology to assess the impact of wind power on power systems. The Task has established an international forum for exchange of
The project has generally aim to support Denmark´s participation in the “IEA Wind Energy R & D Implementing Agreement” in 2013 through participation in the Agreement Steering Committee (“Executive
Currently, individual wind turbines can estimate their possible power of during down-regulation. For large offshore wind power plants, the sum of those signals is larger than the possible power of the
SPOK Consult ApS
ForskEL
2012
2012
The project examines the predictability of theoretical and sea-measured power productions of 3 wave technologies (Pelamis, Wave Dragon and Wavestar), working alone, in combinations of 2, all together
Project "Crest Wing final test follow-up offshore" covers building, laying and offshore test of a Crestwing WEC in a scale of 1-5 full-scale Hanstholm. The purpose of the test run is based on DHI test
The overall objective of the project is to develop a cost-efficient Lidar wind sensor to be integrated on individual wind turbine in order to maximize power production and minimize dynamic load on the
The purpose is to develop and demonstrate methods for cableinstallation, which via improved cable
fabrication and installation can reduce costs for installation of array-, infield- and export cables
To develop and demonstrate the value of a yaw control kit for wind turbines, which continuously measures
the wind direction in front of a wind turbine and subsequently turns the turbine almost