The goal of the project is to develop a barge to jack-up vessel loading technology, which can operate in wavw height of 2.5 m, and that will increase the operation window significantly.
WindCal2.0 will develop and demonstrate a nacelle-mounted lidar calibration method where highly accurate lidars replace cup anemometers as the calibration reference and robots automate and speed up
The project develops a drone inspection solution and digital documentation that recognize and categorize surface errors and measure parts of industrial structures with high precision.
An increasing number of wind turbines are reaching end of life and will soon have to be decommissioned. However, wind turbine blades (WTBs) made of glass fiber reinforced thermoset composites are not
The objective is to ensure future large-scale nacelle test facilities are technical and economically feasible for the wind industry. This will be done by further developing and demonstrating R&D Test
The project partners aim to develop and demonstrate a subsea robot, ACOMAR - Auto COmpact MArine growth Remover, which increases atomization of the marine growth removal process on offshore structures
The project purpose is to deliver easily accessible metocean siting data for design and planning anywhere offshore. Through a scalable quality/cost structure ranging from free general data analytics
The project objectives of GOTWind is the optimization of bolt technology for wind turbines from production until end-of-life. Overall, this project will ensure that there are set out general rules in
The activities in 1996 has to a large degree followed the budget proposal of 27 June 1995. During the year two IEA Executive Committee meeting were held, first in Finland and then in Germany. The
Nordtank Energy Group A/S. Udvikling og Konstruktion
EFP
1996
1997
The key target for the proposal is - by combining the latest technology related to generators and power electronics with the latest in wind turbines - to develop a new generation of grid-connected