Building on the results achieved in a first EUDP project, the purpose of this project is to finalise the development and testing of the technologies needed to produce extra – tall 3D printed wind
Power Curve, the Technical University of Denmark and Statkraft collaborate in order to develop a trailing edge serration product for wind turbine blades that offers increased noise reduction fea-tures
The purpose of the Thunderbolt project is to be able to deliver a fully commercialized service on subscription to the wind energy market after successful project execution, making it possible to
The project is dedicated to enhancing the efficiency and cost-effectiveness of foundation design for offshore structures such as windfarms and energy islands. The envisioned solution involves the
The project allows Floating Power Plant (FPP) to optimise and further develop novel floating wind concepts. The output will be three large demonstration activities and six innovations, including a
Aeromine is a novel, building integrated windenergy system intended to compete with or supplement industrial rooftop solar PV. The EUDP project will improve the understanding of- and demonstrate how
Formålet med projektet er, at have mere pålidelige WTG-vinger i drift med forlænget levetid, sænke OPEX og optimere AEP, gennem anvendelsen af en risikobaseret tilgang. Hvis vingerne kan forblive i
The objectives of this project is to improve on the current practice of basing performance evaluation on a single point measurement of wind speed and instead introduce a method where the wind field
This project has investigated noise emissions from large-scale wind turbines in relation to small-scale wind turbines. In addition, noise nuisance at low frequencies was investigated, noise
The aim of the project is to develop a simulation platform for generation of relevant wind fields applicable for aeroelastic design simulations. This is achieved by development, verification, and
The annex will give the participants an overview of the technical and environmental assessment challenges encountered in offshore applications and help them to understand the areas of further R and D
The wind farm output of an offshore-farm such as Horns Rev changes between nearly constant output to highly variable power output. A balance responsible would benefit from knowing the variability of a
The object of the project was to determine the wave impact on wind turbines and test ways to reduce such impacts. The project showed that all major wave loads are caused by breaking waves and that
The project developed a computer method for quantifying wind turbine structural loads caused by fault ride-through (FRT) requirements. Exemplified in the case of an active stall wind turbine this
The annex will give the participants an overview of the technical and environmental assessment challenges encountered in offshore applications and help them to understand the areas of further R and D
The project included the second phase of a process aimed at establishing a platform for wind turbine simulation as a prerequisite for advanced electrical design and optimisation.
The aim of the project is to develop, verify and implement a detailed physical model for the wind field in a wind farm. The model will allow for detailed aeroelastic simulation of wind turbines sited
The overall objective of the project is to ensure the development of an aetoelastic design complex, which can create the basis for the nest generation of wind turbines and make new design trends
This project, HAVDIM2004, aimed primarily at analysing already accessible measurement data from the two Danish offshore wind farms Horns Rev 1 and Nysted Offshore Wind Farm. The project focused on