The goal of 50 % renewable energy in our energy mix will change the electricity market completely. The 5s-project explores and develops new concepts for the market to handle fluctuating production and
Silicon is today the most used photovoltaic material for solar cells, yet they are complicated and expensive to make. Different composition and micro structures for thin film solar cells made from the
The focus of this project is to develop and demonstrate the energy visualisation system eButler and to address Smart Grid solutions in a new user centered way. The project will demonstrate eButler’s
The purpose of the project is to generate hands-on experience of developing and operating a battery energy storage system in the renewable energy based power system of the future. During the project
DREAM phase 1 provides the necessary analysis and design of end user solutions in order to make a reliable and financial accountable full scale demonstration in succeeding projects with large amount
Batteries of electric vehicles are a potential storage for excess power supply. The project investigates the users of EVs' willingness to participate in intelligent charging and the consequences of
The focus of the current project is to develop cost effective foundation and installation systems for Wave Energy Converters (WEC), by investigating and optimizing novel foundation systems recently
The aim of the project is to develop and validate control and protection system architectures to coordinate the elements of smart grids taking capacity limits of the network grid into account. The
Gas from biomass gasifiers contains both dust and tars, and both components are serious challenges for the downstream equipment as gasturbines and catalytic reactors. This project will test
The vision of the project is to develop a durable, efficient and safe fuel cell (FC) technology, which is suitable for larger scale peak shaving systems in relation to wind mills and SMART grid
EMD INTERNATIONAL A/S
ForskEL
2012
2015
EU has granted 1.2 mio. € to the EU-project stoRE. EMD International is one out of 9 European participants that in stoRE will promote the establishment of Pumped Hydro Storage (PHS) and Compressed Air
FLOAT2 continues the development of the promising results obtained in FLOAT (2011-1-10649) where significant cost reduction for the WaveStar converter was achieved by substituting the building
The development of evacuated glazings approaches prototype production. Thus the basis for decision-making for commercial production will be created within approx. a year and a half.
The project aim is to develop an integrated SOFC module (standard module) which can be based on the most cost effective materials and manufacturing processes in order to reduce SOFC plant expenses.
This project was a pilot study which had as its main goal the evaluation of the use of a simulation method, based on strategic feedback models, to help understanding the evolution of a competitive
The Danish Energy Agency has renewed the Danish participation in the Implementation Agreement on Energy Technology Data Exchange (ETDE) for another 5-year period from January 26th, 1993.
Coordination of all Danish CADDET activities. Mailing of CADDET Newsletters, brochures and similar material. Organization of CADDET register inputs and liasion activities to the CADDET Centre and
The result of any risk analysis is uncertain, sometimes very uncertain. Despite of this fact, there is still a limited tradition for describing uncertainties, mainly due to the lack of appropriate