This project has developed and tested a series of 1G mini-heat pumps of the brine/water type (geothermal heating type) which will become important in future low-energy houses. Three proto-types of a
The project aims to update a five-year old window knowledge system offering users an overview of available energy-efficient solutions for the design of new buildings and replacement of windows in
The objective of the project is to fund Danish efforts in the EU Concerto Class 1 project, which in Denmark comprises 511 low-energy houses in Stenløse, a kindergarten and a senior citizens house. The
For this project, nine low-energy houses were evaluated to gather experience about their energy performance and the residents' experience with living in the houses. The project examined the technical
The project develops an entirely new type of frame/sill design in, for instance, glassfibre-reinforced polyester to create a light, strong, corrosion-resistant and energy-efficient window design in
The project plans and builds a newly developed standard house of low-energy class 1 (from project ENS-33031-0089), whose energy performance and indoor climate are documented by detailed measurements
The project develops a design complex for a district heating system, which, by using new technologies, materials and operating modes, will be able to lower total costs by so much that tomorrow’s low
The pier-based Wave Star Energy test system is now ready for installation at Roshage pier in Hanstholm. For security reasons, the unit was moved into open waters west of the pier. A high footbridge
The aim of the project is to identify, develop and describe existing and new concepts on the supply and installation side and demonstrate that renovations can live up to demands regarding energy
The project investigated the conditions of applying district heating-driven adsorption heating pumps with underground storage for cooling and heating. The concept is most suitable for buildings with a
Air tightness must be brought into focus at an early stage in the planning process, and during the construction phase air tightness measurements should be performed, e.g. on facade sections or in
This project evaluated the performance of the ventilation systems in eight childcare centres, four of which have a natural ventilation system and four others a mechanical ventilation system. The
The present R and D will be used to build a 1:10 scale model of a single AquaBuOY and test and measure its performance in a range of sea conditions at the testsite in Nissum Bredning on 5 meters deep
The objective of the project was to develop a sound basis for the decisions on Energy Performance Contracting (EPC) for ESCOs (Energy Service Companies) and building owners with respect to heating of
The objective of the project is to propose more energy efficient and environmentally friendly solutions for DHW systems in buildings and promote the use of such systems.
The main objective of this research project was to study the potential of reducing energy used for ventilating buildings by using low-polluting building materials.
The Stenløse South project is seen as a forerunner project by many (if not most) of the municipalities in Denmark and many of these has visited the site and the municiplaity or has invited
The project developed dynamic simulation models for water-based building-integrated systems (e.g. floor heating, cooling ceilings and building-integrated cooling systems) and implemented them in the
The main aim of the project has been to reduce the total energy consumption in two typical Danish typehouses to a level corresponding to the demands for low energy class 1 buildings in the building