The objective of this project is to establish a novel type of wind load simulator where the true nature of wind can be simulated. The wind load simulator is central part of a new generation of test
The purpose is to develop and demonstrate a solution, an integrated Crane Basket, solving the challenge to get technicians access to blades on installed turbines – on- as offshore, for safe and
Task27 will focus on the research needs for understanding small wind turbines and their performance in environments of high turbulence including the built-environment. The subtasks are: Continue the
The purpose of ODIN-WIND is to develop and demonstrate a management tool for the decommissioning of offshore wind turbines. The tool will enable stakeholders to reduce the risk, cost and time spent on
To develop and demonstrate cost effective solutions for mitigating leading edge damages on blades on both existing and future wind turbines, based on Bladena’s patented technologies for mitigating
The IEA Wind Task 33 is dealing with databases for optimizing reliability and maintenance procedures for wind turbines. The aim is to address the different developments of data collection and failure
Hans Aage Hjuler (applicant) has been elected to IEA´s working group on “Advanced fuel cells: Annex 22: Polymer Electrolyte Fuel Cells”. Futher, Hans Aage Hjuler has been elected to the Scientific
The project will optimize MW electrolysis technology by developing a highly efficient power supply. The power supply will provide ancillary services in terms of power and frequency regulation for grid
The aim of the project is to exchange information on international development in the field stationary fuel cell systems for distributed generation of electricity. The insight gained is shared with
The project aims to demonstrate energy efficient production of pressurized hydrogen using pressurized solid oxide electrolyser cells. The project also examines the techno-economic potential of the
To contribute to development of new cold climate technology and stimulate new applications for Danish wind technology through IEA Task 19 through forming the basis for new international standards in
J Lemming Rådgivning
EUDP
2014
2015
The project has generally aim to support Denmark's participation in the "IEA Wind Energy R & D Implementing Agreement" in 2014 through participation in the Agreement Steering Committee ("Executive
Objective of the project is to design, build and test a cost efficient and reliable wind turbine nacelle utilizing belts instead of a traditional gearbox. The partners will design and partly build a
The objective of Task 25 is to analyse and further develop the methodology to assess the impact of wind power on power systems. The Task has established an international forum for exchange of
The project has generally aim to support Denmark´s participation in the “IEA Wind Energy R & D Implementing Agreement” in 2013 through participation in the Agreement Steering Committee (“Executive
The overall objective of the project is to develop a cost-efficient Lidar wind sensor to be integrated on individual wind turbine in order to maximize power production and minimize dynamic load on the
The purpose is to develop and demonstrate methods for cableinstallation, which via improved cable
fabrication and installation can reduce costs for installation of array-, infield- and export cables
To develop and demonstrate the value of a yaw control kit for wind turbines, which continuously measures
the wind direction in front of a wind turbine and subsequently turns the turbine almost