The purpose is to develop and demonstrate additive manufacturing methodes in the wind industry. The methods are in this project tested on a Vestas blade section (8 meter I-beam). The methods shall
The overarching program objective is to reduce the overall offshore wind cost of energy by merging the technological leadership of three offshore industry leaders across three participating countries
The project ” Multi-level medium voltage” converter is a development and demonstration project, which by proposing at new design aims at optimizing one of the most important subsystems in a wind
To learn how to build the hybrid UHPC tower in praxis and prepare the technology for commercialization. Further development to up-scale the towers to larger heights, to make the towers entirely from
Task 35 will focus on wind turbine blade and drive train testing and assess their performance and failure criteria in different operating scenarios. The subtasks are: l) Relevant wind turbine
Our objective is to demonstrate an efficient, rugged, low-cost lidar for wind turbine blade pitch control. The new sensor will monitor the wind in front of the turbine using 4 lines-of-sight. This
The purpose of the project is to investigate the future testing strategies for the leading wind turbine manufacturer, to design, develop, assemble and demonstrate the future testing facility to
The New European Wind Atlas wiII as a minimum include: wind resources and their associated uncertainty; extreme wind and uncertainty; turbulence characteristics; adverse weather conditions together
The project aims to develop a new node for offshore wind foundations. Objectives are: 1) New design for process and assembly of jacket foundations; 2) Cost-efficient welding of nodes; 3) Mass
The project objective is to test, verify and document the radar control installation aiming at defining the minimum requirements for this type of system capability. The project will also investigate
The objective of the project is on basis of participation in the IEA Task 29 MeXNext III to utilize the results from a new wind tunnel measurement campaign on a 4.5m rotor (summer 2014) for validation
Seagar aims to develop and demonstrate a device that enables bolts in wind turbine towers to be tightened automatically. The robot moves from bolt to bolt, tightens each bolt and documents all
Goals:
Improve knowledge of the market potential for Small Wind. Identify industrial business plans for
manufacturing and marketing. Improve knowledge of export by means of practical training and
issu
Blade replacement in wind turbines is costly due to the large cranes needed. The Single Blade Exchange without crane system will be able to do the replacement of blades without a mobile crane and with
To be able to install wind turbines and for these to operate in Denmark or in Danish waters, they must be certified and serviced in accordance with the technical certification scheme for wind turbines
The main objective of this project is to advance the overall accuracy of the existing aero-hydroservo-
elastic computer codes related to offshore wind turbines and their substructures. This is
achieve
The project has generally the aim to support Denmark's participation in the "IEA Wind Energy R & D Implementing Agreement" in 2015 through participation in the Agreement Steering Committee ("Executive
The costs of the management of seabed wind farm interaction is high, around one third of the total costs of the foundation of offshore wind farms. The aim of the project is to reduce these costs by
The Megavind Partnership´s vision is to maintain and develop Danish position as wind energy hub and home to the world´s leading companies and research institutes. Megavind´s objective is to identify
Interruptions of installation/uninstallation of wind turbine blades due to high wind speed are a huge cost for the wind industry, especially offshore. The objective of this project is to be able to do