Develop, test, analyse perspectives of, identify challenges by, evaluate and recommend on methodologies to use dynamic, broadcasted, real-time power price(s) for indirect control of the individual
The "PV Island Bornholm" (PVIB) project aims at establish 5 MWp PV on the island of Bornholm. Of this, app. 1MWp will be installed in this phase. PVIB will focus on demonstration and further
EURISCO ApS
ForskEL
2010
2011
Secure communication is becoming increasingly more relevant in a power system where there is a high impact of distributed energy resources (DER). The purpose of this project is to analyse and
Co-funding of ECOSORT (EU CIP Eco-innovation). Documentation of environm. and econ. advantages of a sensor-based sorting of industrial waste for co-combustion. Partners: FORCE Technology, nomi i/s
The Improsume project investigates “prosumer” behavioural responses to playing a balancing role in the electricity system and test different methods to influence these responses. In WP2, we focus on
The project report is the contribution from the industry to an action plan for development and demonstration of CHP technology for solid biomass. The report aims to serve as inspiration and basis for
The central goal of the project is to increase access to the international research results, technological breakthrough and work partners within biomass and energy purpose. The purpose of this is to
If the overall energy policy targets shall be achieved there is a basic need for increased integration and coordination of renewable energy production facilities into the electric power system. More
The purpose was to ensure a better and more rewarding communication between researchers and practicians, to illustrate which projects may become good business, to follow up the ongoing projects and to
University of Copenhagen will in this international IEA – project; contribute to a better cooperation between teen leading bio mass – producers and the using countries. To expand the use of the
The project relates to participation in international corporation in an annex related to lEA (International Energy Agency) on stationary distributed generation of electricity in small power units. In
The project relates to participation in international corporation in an annex related to IEA (International Energy Agency) on stationary fuel cells for distributed generation of power in small units
The participants want to develop fully roof integrated solar collectors to fit all roof materials in shape and design. After development demonstration units should be made and tests to get approval
This project is the first phase in the development of an advanced test facility which will enable the wind power industry to develop and test new grid connection solutions, and validate the grid
The vision of this proposal is to solve the last two inherent problems faced by electric vehicles; A short range and a long recharging time. This is achieved by the development of a highly integrated
On basis of the successful work within the EUDP project ''The Albertslund Concept'' a follow-up EUDP project will be realised, focusing on the further development of the ''Solar Prism'' prototype
The project aims to develop and demonstrate concrete solutions for energy rehabilitation of the building envelope, installations and supplies, taking particular account of the architectural and
Only large-scale projects with holistic approaches lead to sizeable results. The strategies suggested by Annex 51 reports can be grouped into three fundamental fields: reduction of final energy
Through this project Danish energy research and its results have been made available to users in Denmark and abroad. International research and its results have been made available to Danish research
Under the IEA-ETDE (Energy Technology Data Exchange) agreement a common database is produced containing descriptions of journal articles, reports, books, conference papers etc. published in the member