The main purposes of the project were 1) to develop new catalyst materials by applying ‘flame spray deposition’ (FSD); 2) to optimise state-of-the-art MEA materials and electrode structure; 3) to
This project, HAVDIM2004, aimed primarily at analysing already accessible measurement data from the two Danish offshore wind farms Horns Rev 1 and Nysted Offshore Wind Farm. The project focused on
The project developed a PV cell roof based on a modified industrial installation system for commercial nurseries. Components are non-framed PV cell modules with several novel features, including front
This project was meant to develop TK Energi’s stepwise gasification concept and improve full-scale demonstration at a plant in Gjøl. The pilot system was almost completed, but due to a delay, the
The objective of this project was to establish a wood-chip gasification system with a rated input of 600 kW. The system is an upgraded version of the Viking two-step gasifier developed at the
A scale 1:40 Wave Star wave energy converter has gone through more than 600 different wave tests in order to map the characteristics of the machine and optimize the annual energy production in a