In the proposed PV-Boost-2015 project coordinated by Gate 21 it is intended to realise 700 kWp innovative BIPV systems in zero energy and low energy class1 and 0 buildings in 7 dif-ferent cities in
Nordisk Folkecenter for Vedvarende Energi
ForskVE
2010
2011
The immediate project purpose is to support an accelerated enlargement of PV plants in Denmark by documentation and demonstration of two household PV plants with intended “lighthouse effect” and to
Establishment of a data base of O&M data for Wave Dragon established in Nissum Bredning. Large uncertainty exists about fatigue impact on single components used in a wave device caused by repeated
Develop PV-optimised power products, for maximised economical yield of the PV generation. Describe how data from the electronic meters can be integrated into distribution and trading companies'
In connection to agreed Climate plans and low energy building implementation it is proposed to realize best practice building integration of PV systems in Danish cities. There will here be a total
The "PV Island Bornholm" (PVIB) project aims at establish 5 MWp PV on the island of Bornholm. Of this, app. 1MWp will be installed in this phase. PVIB will focus on demonstration and further
The project etablishes a large-scale PV cell system in a completely new canvas structure above the roof of the stand at Hvidovre Stadium as part of the development of a ground-breaking concept for
This project commissions the 500 kW gasifier in the town of Hillerød. The aim is to utilise the experience gathered from the pilot system in the town of Hadsund and develop the system to increase
Grid connection and electricity production optimisation from a 500 kW Wave Star wave power unit located at Horns Rev. The project is closely linked to project 10239. If the project achieves the
The purpose of this project is to disseminate information and knowledge about the use of solar cells in houses. In the project BIPV solutions has been developed, installed and tested in four new
The roofing layout for the new office building is designed with roof surface with single slope in one direction. All roof structures will be with aluminium sheet cladding sufficient for adding solar
The project aims over a three year period to install approximately 1 MWp of grid connected PV systems on a selection of the municipal buildings targeting coverage of all major building applications, e
Optimization of power production and reliability of the Wave Star prototype in Hanstholm. The funding is given as a temporary additional per production hour, and is activated by attainment of