This project aims at testing the Weptos WEC for the first time in an uncontrolled - real sea environment. This will give the opportunity to check the extensive findings from the previous
The objective of the project is to achieve final proof of concept of the Wavepiston technology. A scaled model has earlier been validated at University of Aalborg and a pilot project has been
The purpose of the project is final engineering, drawing, design, production and installation of a Crestwing prototype close to full scale. It will show its potential and demonstrate its high
The objective og this project is to develop a new material and method that benefits installation, survivability and lifetime of sub-structures of wave energy converters. The results of the project
The projects objectives are 1) to define the long-term wave climate around Hanstholm area using measurements from three buoys off Hanstholm and by validating modelled against buoy-measured data, and 2
This open-access book aims at giving a clear overview of all the main technical and commercial aspects that are involved with the development of wave energy converters. The book will be written by
The project´s objective is to build a theoretical knowledge about gyro electric energy conversion systems, particularly for use in connection with wave energy. The primary goal will be to develop a
Projektet omfatter assistancen til opgaver i forbindelse med Danmarks medlemskab af IEA-OES i 2016:
I lighed med 2014 dækker ansøgningen deltagelse i de årlige EXCO møder
30 de ExCo Meeting
The purpose is to build a 500 kW wave energy demonstrator for the North Sea, as a first very important step towards commercialisation of wave energy. The EUDP funds mainly cover the very extensive
The project is based on a previously tested 1:40 model of a new type of wave energy converter, which has so far shown good properties. The objective of the project is to measure loads on the
The first step is to combine a hydrodynamic model of the waves with a dynamic model for the mechanical and hydraulic PTO system to achieve an understanding of the principles behind optimising energy
Optimization of power production and reliability of the Wave Star prototype in Hanstholm. The funding is given as a temporary additional per production hour, and is activated by attainment of
The project will test the abilities of the wave wing as an energy absorber. The test will be performed in the wave tank at AAU following preparation of measuring setup, component list and plan for