This project aims at testing the Weptos WEC for the first time in an uncontrolled - real sea environment. This will give the opportunity to check the extensive findings from the previous
The objective of the project is to achieve final proof of concept of the Wavepiston technology. A scaled model has earlier been validated at University of Aalborg and a pilot project has been
The purpose of the project is final engineering, drawing, design, production and installation of a Crestwing prototype close to full scale. It will show its potential and demonstrate its high
The objective og this project is to develop a new material and method that benefits installation, survivability and lifetime of sub-structures of wave energy converters. The results of the project
The projects objectives are 1) to define the long-term wave climate around Hanstholm area using measurements from three buoys off Hanstholm and by validating modelled against buoy-measured data, and 2
This open-access book aims at giving a clear overview of all the main technical and commercial aspects that are involved with the development of wave energy converters. The book will be written by
The project´s objective is to build a theoretical knowledge about gyro electric energy conversion systems, particularly for use in connection with wave energy. The primary goal will be to develop a
Projektet omfatter assistancen til opgaver i forbindelse med Danmarks medlemskab af IEA-OES i 2016:
I lighed med 2014 dækker ansøgningen deltagelse i de årlige EXCO møder
30 de ExCo Meeting
The objective of the project is to make a 24 m long 1:10 scale version of a Leancon wave power machine that uses airflows created by a wave moving up and down a tube. The project is based on a
The project aims at optimising Wave Star wave machine production from irregular waves through sophisticated control of the back pressure in the hydraulic system in each floater. The system is being
The project gathers international research communities to develop design tools and a common design basis for wave power facilities to make them more competitive. The aim is to develop a wave-to-wire
Grid connection and electricity production optimisation from a 500 kW Wave Star wave power unit located at Horns Rev. The project is closely linked to project 10239. If the project achieves the