The PossPOW project developed a verified real-time power curve for offshore wind power plants, also applicable under downregulation. Concert will enrich this to a full asset optimisation package
NetVind aims toward the green transition in Denmark, by rethinking the way of using wind power plants in distribution systems. NetVind analyses and demonstrates in a large experimental facility, which
The NSON-DK project is the Danish part of a North Sea Offshore Network (NSON) project umbrella with research participants from UK, Germany, Norway and Netherlands. The purpose is to study the impact
The objective of BLATIGUE is to develop fast and efficient fatigue test methods for large wind turbine blades and to develop equipment to excite the blades under such tests.
Turbines are designed to change its direction as a change in the wind direction occurs, and partial wear occurs when the windmill actively yaws back and forth in a too narrow spectrum for a long time
The aim of this project is to proof the iSpin measurement capability and robustness on a broad scale. The robustness shall be proven based on measurements of a total of around 90 WTGs located in 9
The objective of the project is to develop an offshore self-hoisting crane (OSHC) based on the principles of Liftra Self Hoisting Crane (LSHC). The OSHC must be operable from a floating platform
The aim of this project is to expand the detecation capabilities of the current Windar lidar systems to include a robust wake detection system under varying atmospheric conditions .Develop different
The objective of IMPACT is to develop computationally efficient and accurate fatigue lifetime prediction methods for adhesive connections in large utility wind turbine roto blades.
The project has generally the aim to support Denmark's participation in the "IEA Wind Energy R & D Implementing Agreement" in 2017 through participation as Alternate member in the Agreement Steering
The aim is to participate to the IEA Task on Quiet Wind Turbine Technology gathering institutions worldwide. It will first focus on amplitude modulation. The intended results are better physical
The purpose of this project is to establish demonstration, develop solutions fit for market and prove through a series of sub-component tests and on a 7MW off-shore turbine that the technology is
In the work concerning experimental verification of thick airfoils, the focus has been on airfoils used by the industry. The method has been verified with measurements on a NACA 63-215 airfoil
The project objective is to develop more generally applicable assessment and design criteria for isolated power supply systems, and the expected result is a guideline for design of such systems.