Find Projects on our website via the search function on this page.
Displays 241 - 260 of 338
Ørsted A/S
ForskEL
2005
2011
The purpose of this project was to develop materials with higher resistance to the corrosive elements, in order to reduce the cost of maintenance, increase the availability, and increase the
The object of the project was to develop an experimental method for estimating the modal properties of wind turbines during operation. OMA (Operational Modal Analysis) proved suitable for
The objective was to assess the potential of addition of sulphur with a view to emission control in connection with natural gas-firing in swirl-stabilised diffusion burner and in engines and, if
The main purpose of PV Denmark is to continue and enhance the positive development initiated by previous national projects such as Sol-300, Sol-1000 and Sol-2000. The activities shall facilitate, that
The objective of the overall project was to develop a system for online optimisation of waste incineration. Phase 2 worked to design a measuring programme at Haderslev CHP plant to determine the key
The project demonstrated and documented the RECCAT system in full scale on the 1.5 MW Rolls Royce engine of Rask Mølle heating plant. Too small reactor size entailed reduced ability to maintain the
GAIA SOLAR A/S
ForskEL
2006
2011
The project aims at developing a window solution, with integrated solar cells in the glazing, which is 30% cheaper than similar products on the market. Development and production of components is
This project is one of several projects with the common purpose of predicting electricity generation from a wind farm for up to 48-60 hours based on meteorological forecasts.
The work documented in this thesis has had its focus on two main sections. The first part is centred around Maximum Power Point Tracking (MPPT) techniques for photovoltaic arrays, optimised for fast
The PSO Project 5820 aimed to study deposit-induced Cl corrosion under well-controlled laboratory conditions, simulating the conditions in biomass-fired boilers. This was done by exposing pieces of
The aim of this project is to implement an online volatile fatty acids (VFA) sensor developed at E and R DTU for monitoring, control and optimization of the biogas process.
The development of evacuated glazings approaches prototype production. Thus the basis for decision-making for commercial production will be created within approx. a year and a half.
The project aim is to develop an integrated SOFC module (standard module) which can be based on the most cost effective materials and manufacturing processes in order to reduce SOFC plant expenses.
This project was a pilot study which had as its main goal the evaluation of the use of a simulation method, based on strategic feedback models, to help understanding the evolution of a competitive
The Danish Energy Agency has renewed the Danish participation in the Implementation Agreement on Energy Technology Data Exchange (ETDE) for another 5-year period from January 26th, 1993.
Coordination of all Danish CADDET activities. Mailing of CADDET Newsletters, brochures and similar material. Organization of CADDET register inputs and liasion activities to the CADDET Centre and
The result of any risk analysis is uncertain, sometimes very uncertain. Despite of this fact, there is still a limited tradition for describing uncertainties, mainly due to the lack of appropriate
The activities in 1996 has to a large degree followed the budget proposal of 27 June 1995. During the year two IEA Executive Committee meeting were held, first in Finland and then in Germany. The