This project was meant to develop TK Energi’s stepwise gasification concept and improve full-scale demonstration at a plant in Gjøl. The pilot system was almost completed, but due to a delay, the
The objective of this project was to establish a wood-chip gasification system with a rated input of 600 kW. The system is an upgraded version of the Viking two-step gasifier developed at the
A scale 1:40 Wave Star wave energy converter has gone through more than 600 different wave tests in order to map the characteristics of the machine and optimize the annual energy production in a
The project studied oxidation behaviour of TP 347H and X20 in steam in field/laboratory testing and thermodynamic/kinetic modelling. TP 347H: The interior of the alloy grains oxidise internally
Investigations of long term exposure of SCR catalysts to flue gas from coal-straw co-firing has been carried out in two units of the Studstrup Power Plant with an average fraction of 10% straw on an
This project demonstrated that further improvement and automation of wind power predictions within a 48-hour horizon is possible if the underlying tools such as WPPT (Wind Power Prediction Tool)
The objective was to investigate the safety conditions of the Viking system and to develop and implement a new operating system for flexible heating and electricity demand. The project improved a
In Europe, a number of standards for characterising biofuels are under development. The standards are to promote trade in biofuels on equal terms. The long-term objective of this project is to