A ground breaking new technology for thermal stratification of solar hot water tanks has been invented December 2013. After only a few prototypes the technology offers competitive thermal performance
The project ” Multi-level medium voltage” converter is a development and demonstration project, which by proposing at new design aims at optimizing one of the most important subsystems in a wind
The project goal is to widen the application of solar cells on facades in urban spaces by refining the architectural expression via innovative building integrated solar cells by using built-in light
The project aims to develop and demonstrate a PV-panel which will both work as a balcony fence and at the same time produce energy to the electricity grid. The PV-panel will be building integrated, be
The aim of the project is to develop, demonstrate and commercialize new competitive building systems for commercial buildings based on the concept of combining concrete building components with thin
The proposed EUDP project will be realised as a new initiative based on results from the ongoing EUDP project “Low cost PV roof as a complete climate shield”, with the aim to develop a “Low cost
The project aims to develop and demonstrate a control strategy and a web-based control for optimal interaction between the solar collectors, solar cells, energy storage, heat pump and the building's
To learn how to build the hybrid UHPC tower in praxis and prepare the technology for commercialization. Further development to up-scale the towers to larger heights, to make the towers entirely from
Task 35 will focus on wind turbine blade and drive train testing and assess their performance and failure criteria in different operating scenarios. The subtasks are: l) Relevant wind turbine
Our objective is to demonstrate an efficient, rugged, low-cost lidar for wind turbine blade pitch control. The new sensor will monitor the wind in front of the turbine using 4 lines-of-sight. This
The purpose of the project is to investigate the future testing strategies for the leading wind turbine manufacturer, to design, develop, assemble and demonstrate the future testing facility to
The New European Wind Atlas wiII as a minimum include: wind resources and their associated uncertainty; extreme wind and uncertainty; turbulence characteristics; adverse weather conditions together
The purpose of the project is to follow the performance of two pit heat storages and one borehole storage implemented 2011-3013 in Denmark. In the project monitoring results and experiences from
The project aims to develop a new node for offshore wind foundations. Objectives are: 1) New design for process and assembly of jacket foundations; 2) Cost-efficient welding of nodes; 3) Mass
The purpose is to develop and demonstrate a new efficient and flexible technology for fault localization/-diagnosis in PV systems. The technology is aimed the growing PV service market. Measurements
Heliac has invented and patented a foil that enables a reduction installation costs of solar fields from 500$⁄m2 to 2- 10$⁄m2 and reduce the overall cost by 80%. Proof-of-concept in lab scale was
The project objective is to test, verify and document the radar control installation aiming at defining the minimum requirements for this type of system capability. The project will also investigate
The project will demonstrate that solar energy modules can transform an old multistory residential building into a beautiful self- sufficient architectural building getting free renewable electrical
The objective of the project is on basis of participation in the IEA Task 29 MeXNext III to utilize the results from a new wind tunnel measurement campaign on a 4.5m rotor (summer 2014) for validation
Seagar aims to develop and demonstrate a device that enables bolts in wind turbine towers to be tightened automatically. The robot moves from bolt to bolt, tightens each bolt and documents all