RUNE is short for - Reducing Uncertainty of Near-shore wind resource Estimates using onshore lidars. The key project aim is to reduce the uncertainty of offshore wind resources in Danish near-shore
New cooling technology and newly developed communication and management solution allows access to untapped reserves the telecommunication companies. Reserves that are already established. The way to
The purpose of the project is final engineering, drawing, design, production and installation of a Crestwing prototype close to full scale. It will show its potential and demonstrate its high
Solid oxide electrolysis cells (SOECs) are a promising technology for energy storage and synthetic fuel production and it has a unique potential for grid regulation in the Danish power system. This
A main result of the Low Cost Active House BIPV project is to realise a demonstration campaign with 3 MWp, low cost BIPV solutions in connection to low energy class 2020, energy neutral and plus
The goal of SDVP Connect is to mobilize the Heat Pump ITC-platform, developed in collaboration with Energinet.dk and ForskEL, on the Smart Grid market.
Combining silicon solar cells and high efficiency solar cells into one cost-efficient, high-efficiency solar cell has been a dream of the solar industry for decades. However, differences in the
Grid side converter (GSC) is the key for PV integration. GSCs are still not capable of advanced control features that enable the full control of PV systems with fault ride through, reactive power
The overall target for this project is to develop an industrialized concept for Building Integrated Solar PV-BIPV that visualizes a number of added values, minimizes additional costs and thus paves
The main purposes of the project were 1) to develop new catalyst materials by applying ‘flame spray deposition’ (FSD); 2) to optimise state-of-the-art MEA materials and electrode structure; 3) to
This project, HAVDIM2004, aimed primarily at analysing already accessible measurement data from the two Danish offshore wind farms Horns Rev 1 and Nysted Offshore Wind Farm. The project focused on
The project developed a PV cell roof based on a modified industrial installation system for commercial nurseries. Components are non-framed PV cell modules with several novel features, including front
This project was meant to develop TK Energi’s stepwise gasification concept and improve full-scale demonstration at a plant in Gjøl. The pilot system was almost completed, but due to a delay, the
The objective of this project was to establish a wood-chip gasification system with a rated input of 600 kW. The system is an upgraded version of the Viking two-step gasifier developed at the