This project aims at testing the Weptos WEC for the first time in an uncontrolled - real sea environment. This will give the opportunity to check the extensive findings from the previous
The objective of the project is to achieve final proof of concept of the Wavepiston technology. A scaled model has earlier been validated at University of Aalborg and a pilot project has been
The purpose of the project is final engineering, drawing, design, production and installation of a Crestwing prototype close to full scale. It will show its potential and demonstrate its high
The objective og this project is to develop a new material and method that benefits installation, survivability and lifetime of sub-structures of wave energy converters. The results of the project
The projects objectives are 1) to define the long-term wave climate around Hanstholm area using measurements from three buoys off Hanstholm and by validating modelled against buoy-measured data, and 2
This open-access book aims at giving a clear overview of all the main technical and commercial aspects that are involved with the development of wave energy converters. The book will be written by
The project´s objective is to build a theoretical knowledge about gyro electric energy conversion systems, particularly for use in connection with wave energy. The primary goal will be to develop a
Projektet omfatter assistancen til opgaver i forbindelse med Danmarks medlemskab af IEA-OES i 2016:
I lighed med 2014 dækker ansøgningen deltagelse i de årlige EXCO møder
30 de ExCo Meeting
Weptos A/S receives the award "Årets bedste ForskEL projekt 2012" for best energy research project awarded by Energinet.DK. The award was given to Weptos A/S for an excellent and professionally
The purpose of this project is to demonstrate and optimize the design of a 5 kW grid connected wave energy LOPF (Lever Operated Pivoting Float) buoy, through a design study and subsequent test in the
Pre-study to design and demonstrate, in small scale, cost effective solutions for 3 commonly identified challenges in the wave power industry, which typically involves floating devices. High efficient
The objective for Partnership for Wavepower Roadmaps are to consolidate and combine the Danish Wave Developers common efforts and produce plans to achieve common goals for Anchor systems, Power