An intensified focus on construction's embodied climate impacts has made Danish participation in IEA EBC Annex 72 particularly relevant. With this application, funding is sought to strengthen Danish
This project aims to improve the energy efficiency of newly built and existing medium and large
sized commercial and public buildings by delivering a cost-effective IoT-enabled and Cloud-based
system
The objective of this project is to develop a Diagnostics Tool for Automatic, Smart, and Cost-effective Data Validation, Fault and Anomaly Prediction, Detection, and Diagnosis in the District Heating
Development of a super-efficient and price competitive, dedicated CO2 heat pump with air as heat source. It will be a factory built and mass-produced plug and play solution. The heat pump will use
To develop, design, calculate system integration and business cases for pit thermal storages fitting into all kind of district heating and cooling systems
We will participate in the final part of the work with task 3 under annex XV. Task 3 covers advanced methods, operation and risk aspects as well as innovative solutions for excess heat recovery.
The
Blue Atlas Robotics is developing an underwater robot that autonomously images large underwater structures, including ships and harbor quay walls, to radically improve the quantity, quality, and
The purpose of the power buoy development program is to support the green transition of the global maritime industry by eliminating and removing CO2 pollution and particle emission caused by the
LED iBond aims to develop and demonstrate a new generation of the Tracy Panel, in which the lighting structure serves as conductor for the electricity for the LEDs but also as IoT infrastructure.
The present continuation of the project 2 Generation solar walls is convering the work in an iterative process, with simulation, results analysis and programme study being the main elements. Thus, it
The project is finished with the book 'Foresight' describing the paramount changes following the increased capacity of computers, reduced size, web connectivity, mobility and improved performance
The aim of the project is to prepare and participation in the International Energy Agency Workshop on Advanced Glazing and Window Systems for Building in July 1998.
Early 1997, the Executive Committee of IEA SH and CP approved a 2 year extension of Task 20 'Solar Energy in Building Renovation'. The aim of this extension was to develop strategies for an effective
The purpose of the project was to develop and test a shrimp-trawl based on new strong materials (dyneema) which permits the construction of a trawl with thinner twines and hence lower water resistence
The main objective of the Task is to promote daylight-conscious building design with the aim of realising energy savings and visual comfort and amenity value of the building.
The main goal of the project is to collect available material from the participants in Task 13 concerning measured and calculated results and present the main results of the different projects in one
The aim of the project is to select various components applicable for capacity regulation of heat pumps and to examine various regulation strategies for such.
The objective is to contribute a continuous, efficient and target-group oriented dissemination of the results of the research programme: Use of Energy in Buildings.