An intensified focus on construction's embodied climate impacts has made Danish participation in IEA EBC Annex 72 particularly relevant. With this application, funding is sought to strengthen Danish
This project aims to improve the energy efficiency of newly built and existing medium and large
sized commercial and public buildings by delivering a cost-effective IoT-enabled and Cloud-based
system
The objective of this project is to develop a Diagnostics Tool for Automatic, Smart, and Cost-effective Data Validation, Fault and Anomaly Prediction, Detection, and Diagnosis in the District Heating
Development of a super-efficient and price competitive, dedicated CO2 heat pump with air as heat source. It will be a factory built and mass-produced plug and play solution. The heat pump will use
To develop, design, calculate system integration and business cases for pit thermal storages fitting into all kind of district heating and cooling systems
We will participate in the final part of the work with task 3 under annex XV. Task 3 covers advanced methods, operation and risk aspects as well as innovative solutions for excess heat recovery.
The
Blue Atlas Robotics is developing an underwater robot that autonomously images large underwater structures, including ships and harbor quay walls, to radically improve the quantity, quality, and
The purpose of the power buoy development program is to support the green transition of the global maritime industry by eliminating and removing CO2 pollution and particle emission caused by the
LED iBond aims to develop and demonstrate a new generation of the Tracy Panel, in which the lighting structure serves as conductor for the electricity for the LEDs but also as IoT infrastructure.
The aim of the project is to identify, develop and describe existing and new concepts on the supply and installation side and demonstrate that renovations can live up to demands regarding energy
The project investigated the conditions of applying district heating-driven adsorption heating pumps with underground storage for cooling and heating. The concept is most suitable for buildings with a
Air tightness must be brought into focus at an early stage in the planning process, and during the construction phase air tightness measurements should be performed, e.g. on facade sections or in
This project evaluated the performance of the ventilation systems in eight childcare centres, four of which have a natural ventilation system and four others a mechanical ventilation system. The
Together with the sector suppliers, the project developed a complete testing basis for assessment of the energy properties of ventilation devices on the basis of recognised Danish and foreign
Based on experience with ESCO projects in a number of local authority areas, NRGi Rådgivning developed and evaluated a phase-divided model for an ESCO partnership aiming to make it easier for the
In 1,452 households with remote-read meters in the Syd Energi supply area, customers received regular feedback on their electricity consumption via SMS or e-mail in a pilot project. The subsequent
The project idea is to use prefabricated thermo-active structures as concrete slabs with embedded plastic pipes (PEX). The active concrete slabs are used both as cooling and heating system, peak load
This project has included a PhD course at Aalborg University (AAU) and the Technical University of Denmark (DTU)/University of Southern Denamrk (SDU) and it has developed two types of converter which