The aim is to participate to the IEA Task on Quiet Wind Turbine Technology gathering institutions worldwide. It will first focus on amplitude modulation. The intended results are better physical
The purpose of this project is to establish demonstration, develop solutions fit for market and prove through a series of sub-component tests and on a 7MW off-shore turbine that the technology is
RUNE is short for - Reducing Uncertainty of Near-shore wind resource Estimates using onshore lidars. The key project aim is to reduce the uncertainty of offshore wind resources in Danish near-shore
This project aims at testing the Weptos WEC for the first time in an uncontrolled - real sea environment. This will give the opportunity to check the extensive findings from the previous
The objective of the project is to achieve final proof of concept of the Wavepiston technology. A scaled model has earlier been validated at University of Aalborg and a pilot project has been
The purpose of the project is final engineering, drawing, design, production and installation of a Crestwing prototype close to full scale. It will show its potential and demonstrate its high
RePlan project is a frontrunner for the integration of large share of renewable energy in the Danish power system. The novelty of RePlan consists in the investigation and verification of the ancillary
The objective is to improve wind farm modeling techniques and establish guidelines for their usage for the industrial and academic partners. This goal will be reached by supporting the extension of
The objective og this project is to develop a new material and method that benefits installation, survivability and lifetime of sub-structures of wave energy converters. The results of the project
The objective of this project is to develope a test machine, a rain erosion tester, on which rain erosion af wind turbine blades can be simulated. The rain erosion tester can acelerate simulate
A close collaboration between LM Wind Power and DTU aims to demonstrate a business case and map risks of new load alleviating blade technologies combined with multi-disciplinary optimization. A larger
Danish participation in IEA Wind Task 26 extension will enhance collaboration and understanding of cost trends in wind power, and contribute to knowledge dissemination on the cost aspects of wind
This project supports the Danish participation in IEA Wind Task 37 which aims to establish an international forum to catalyze the usage of systems engineering to design wind power plants, taking into
The project has generally the aim to support Denmark's participation in the "IEA Wind Energy R & D
Implementing Agreement" in 2016 through participation in the Agreement Steering Committee ("Executive
The projects objectives are 1) to define the long-term wave climate around Hanstholm area using measurements from three buoys off Hanstholm and by validating modelled against buoy-measured data, and 2
With the growing importance of integration of wind energy into power systems, the scope of Task 25 is proposed to be enhanced and broadened and to include collaboration with integration of solar
The DreamWind project is a collaboration between Vestas, Aarhus University and the Danish Technological Institute aiming at the development of novel recyclable composite materials for future wind