More than 500 households with electric heating participated in a demonstration project about demand response. Participants paid for electricity based on spot prices. The groups notified of the next
Contact-free, fast optic measurements of NO and other gas concentrations at high temperatures in boiler rooms, burners and engines are of particular interest. In this context, the infrared (IR) and UV
The project developed a computer method for quantifying wind turbine structural loads caused by fault ride-through (FRT) requirements. Exemplified in the case of an active stall wind turbine this
The project studies two issues in distribution systems 1)Normal Operation Optimization models the load optimal response to electricity price, power system constraint impacts. 2)Control Strategies in
It is the goal to increase the fundament for optimising pellet production and give relations between the quality of the pellet and the conditions during the production.
The aim of the MaxiFuels project is the pilot-scale testing and further developemnt of the 2nd generation concept for bioethanol production from lignocellulosic biomass with the production of biogas
The purpose of this project was to show that condensing flue gasses after filtration in a bag filter is an economical and environmental friendly solution for straw fired heating plants.
The opbejctive of the project has been to improve design and process stability in biogas plants. The results can be divided within the following main categories: 1) Pre-treatment, serial coupling of
Co-digestion of manure with fatty waste may improve biogas production and thus the economy of manure-based biogas plants. However, fat is potentially inhibiting for the biogas process, and biogas
The purpose of this project has been to extend the foundation module in HAWC and FLEX to be able to simulate the frequency dependent stiffness and damping of the foundations.
The Project is a preliminary study of the possibilities for realization of 'Wind Power Academy' on Lolland. The vision of a Wind Power Academy was made as Energi E2 decided to establish a new park of
The objective of the project was to study new deNOx catalysts with improved alkali resistance in relation to flue gas from biomass-fired facilities. Alkali resistance of three types of catalysts is so
Experimental investigations were conducted on two identical small-scale SI gas engine generator sets operating on biomass-produced gas from thermal wood gasification. The engines operated with two
The project was the first of a total of five phases, aimed at better understanding and modelling of the dioxin-formation mechanisms in waste-incineration plants. New insight was gained, which may