The purpose of the project is to investigate the future testing strategies for the leading wind turbine manufacturer, to design, develop, assemble and demonstrate the future testing facility to
In this project Danish and Swedish partners possess complementing technologies comprising the whole Chain leading to 2. generation bioethanol production. The project aims in demonstration scale to
Gas from biomass gasifiers contains a significant amount of hydrogen sulfide that must be removed if the gas is to be converted to e.g. synthetic fuels. The purpose of this project is to remove the
The New European Wind Atlas wiII as a minimum include: wind resources and their associated uncertainty; extreme wind and uncertainty; turbulence characteristics; adverse weather conditions together
The project aims to develop a new node for offshore wind foundations. Objectives are: 1) New design for process and assembly of jacket foundations; 2) Cost-efficient welding of nodes; 3) Mass
The project SYNFUEL is reasearching how to combine electrolysis and gasification of biomass in a way that produces more biofuel from the same ammount of biomass.
ElectroGas develops knowledge and technology which can take surplus electricity from renewable energy and use it to upgrade CO2 to CH4 by feeding it to microorganisms present in biogas reactors.
SYNFERON aims at establishing a new technology platform that combines thermochemical and biological processing of biomass in order to make the production of biogas easier.
Air traffic will be dependent on liqued fuels in all foreseeable future. The goal of FLABBERGAST is to develop an environmentally sustainable production of bioethanol that also fulfills the physical
The foundation for wind turbines at sea needs to withstand occational extreme waves. Extreme waves are a well known phenomenon, however the exact stress they put on under water foundations are not
The objective of this project is to develop and demonstrate a 10 MW pressurized entrained flow gasiflcation technology that can utilize low quality biomasses in the energy sector in an efficient and
We will optimize stalk as a biomass. By pregrinding the stalk, we can reduce the residence time in the biogas reactor. The particle size of 05-15 mm. will be much easier to organically convert, and we
The project objective is to test, verify and document the radar control installation aiming at defining the minimum requirements for this type of system capability. The project will also investigate
The objective of the project is on basis of participation in the IEA Task 29 MeXNext III to utilize the results from a new wind tunnel measurement campaign on a 4.5m rotor (summer 2014) for validation
Seagar aims to develop and demonstrate a device that enables bolts in wind turbine towers to be tightened automatically. The robot moves from bolt to bolt, tightens each bolt and documents all
Goals:
Improve knowledge of the market potential for Small Wind. Identify industrial business plans for
manufacturing and marketing. Improve knowledge of export by means of practical training and
issu
Blade replacement in wind turbines is costly due to the large cranes needed. The Single Blade Exchange without crane system will be able to do the replacement of blades without a mobile crane and with
LM WIND POWER A/S
Innovationsfonden
2015
2018
The project OPTI_MADE_BLADE has as its goal to develop and commercialize a new concept for procuction of large (>70m) wings for offshore windmills.
Innovationsfonden
2014
2018
The project INNOMILL works towards development of a more profitable and ultra flexible high precision system for fabrication of big elements in the wind mill industry. The goal is to reduce the cost