This project aims at testing the Weptos WEC for the first time in an uncontrolled - real sea environment. This will give the opportunity to check the extensive findings from the previous
The purpose of the project is final engineering, drawing, design, production and installation of a Crestwing prototype close to full scale. It will show its potential and demonstrate its high
A main result of the Low Cost Active House BIPV project is to realise a demonstration campaign with 3 MWp, low cost BIPV solutions in connection to low energy class 2020, energy neutral and plus
Combining silicon solar cells and high efficiency solar cells into one cost-efficient, high-efficiency solar cell has been a dream of the solar industry for decades. However, differences in the
Grid side converter (GSC) is the key for PV integration. GSCs are still not capable of advanced control features that enable the full control of PV systems with fault ride through, reactive power
The overall target for this project is to develop an industrialized concept for Building Integrated Solar PV-BIPV that visualizes a number of added values, minimizes additional costs and thus paves
The aim of the project is to work with Danish housing associations to organise sketch designs and realisation of building integration of PV solutions (BIPV). The total proposed implementation for roof
The purpose of the project is through applied research and development to demonstrate and develop a building-integratable, transparent PV module harvesting direct sunlight, acting as intelligent
An energy payback time less than 1 year for a complete polymer solar cell plant is now reality. DTU, EnergiMidt and Gaia Solar are now taking the next crucial step towards sustainable reliable energy
The purpose is to secure a strong Danish representation in the international committee working with standardization through IEC TC-114. The project secures, that Denmark will be able to influence and
In the BIPV Quality Cities project the total amount of PV systems with special focus on BIPV Quality, Solar Watch online monitoring and a combined focus electricity savings will amount to 3.850 kWp.
The main purpose of the planned Phase III (PVIB-III) is establishment of 1,5 – 2 MW of additional capacity primarily in terms of a large utility scale PV power plant of at least 1,5 MW. Thus very
Weptos A/S receives the award "Årets bedste ForskEL projekt 2012" for best energy research project awarded by Energinet.DK. The award was given to Weptos A/S for an excellent and professionally
The purpose of this project is to demonstrate and optimize the design of a 5 kW grid connected wave energy LOPF (Lever Operated Pivoting Float) buoy, through a design study and subsequent test in the
Pre-study to design and demonstrate, in small scale, cost effective solutions for 3 commonly identified challenges in the wave power industry, which typically involves floating devices. High efficient
This project focuses on the integration of photovoltaics (PVs) with thermoelectric generators (TEGs) and microchannel heat exchangers (µHX) in two parallel phases: low-thickness solar power systems
The scope of PV GRID is to address the large potential for stimulating commercial investment in PV in DK. The project purpose is to address identified barriers and assign possible solutions. A central
The project deals with the continued operation and development of Wave Star pilot plant in Hanstholm with a focus on increasing the service life and reduce operating and maintenance costs, thus
SPOK Consult ApS
ForskEL
2012
2012
The project examines the predictability of theoretical and sea-measured power productions of 3 wave technologies (Pelamis, Wave Dragon and Wavestar), working alone, in combinations of 2, all together