RUNE is short for - Reducing Uncertainty of Near-shore wind resource Estimates using onshore lidars. The key project aim is to reduce the uncertainty of offshore wind resources in Danish near-shore
This project aims at testing the Weptos WEC for the first time in an uncontrolled - real sea environment. This will give the opportunity to check the extensive findings from the previous
New cooling technology and newly developed communication and management solution allows access to untapped reserves the telecommunication companies. Reserves that are already established. The way to
A complete up-scaled version of BioSynergi Process' air-staged gasification-CHP system (300 kW electricity / 750 kJ /s of heat) is ready to start test operation in autumn 2014.The project covers the
The purpose of the project is final engineering, drawing, design, production and installation of a Crestwing prototype close to full scale. It will show its potential and demonstrate its high
Solid oxide electrolysis cells (SOECs) are a promising technology for energy storage and synthetic fuel production and it has a unique potential for grid regulation in the Danish power system. This
A main result of the Low Cost Active House BIPV project is to realise a demonstration campaign with 3 MWp, low cost BIPV solutions in connection to low energy class 2020, energy neutral and plus
The goal of SDVP Connect is to mobilize the Heat Pump ITC-platform, developed in collaboration with Energinet.dk and ForskEL, on the Smart Grid market.
Combining silicon solar cells and high efficiency solar cells into one cost-efficient, high-efficiency solar cell has been a dream of the solar industry for decades. However, differences in the
Grid side converter (GSC) is the key for PV integration. GSCs are still not capable of advanced control features that enable the full control of PV systems with fault ride through, reactive power
The overall target for this project is to develop an industrialized concept for Building Integrated Solar PV-BIPV that visualizes a number of added values, minimizes additional costs and thus paves
SOLBY2006 Solar energy in the energy frame – phase 2. The purpose of phase 2 was to implement a number of development and demonstration projects of solar thermal and photovoltaics for low energy
During the project, investigations and development has been performed, focusing on an evaluation of the overall feasibility of gasification of solid biomass in general.
In the present project was investigated how and to which extent the effluent from the biogas process has to be purified in order to recirculate this stream as process water in the MaxiFuels process
The aim of the work is to participate in the IEA Hydrogen Implementing Agreement (HIA), in order to stimulate and co-ordinate hydrogen activities in Denmark.
The project included the development of a Battery Management System (BMS) to control the discharging and charging of each cell in a 20 cell 72 V Lithium-ion battery.
The purpose of this project is to analyse the connection between regulation of transport (e.g. taxes), and households demand for cars, types of cars and amount of driving. A core element of the