The Megavind Partnership was founded in 2006 and the project 2008-2010 is a continuation of the earlier stages of the partnership. It has been the goal of the partnership to establish the foundation
Energy technology research development and demonstration of 2nd generation alkaline electrolysis by: Improved electrode efficiency. Higher operation temperature. Higher operation pressure. Improved
The work is a part of the international cooperation to the IEA-Wind Implementing Agreement, and belongs to a new task - Annex 28: Social Acceptance of Wind Energy Projects. The project has collected
Fuel cell based backup power and UPS was developed with hydrogen from natural gas, LPG or methanol. Potential customers have shown considerable interest in alternative fuels for fuel cells
LINK2009 is a public private partnership. The objective is to develop state-of-art fuel cell systems for hydrogen vehicles and a 350bar hydrogen refuelling station. In Phase 1 is supported by the
The main goal of this project was to assist in facilitating a successful deployment of micro combined heat and power fuel cells to the benefit of society and the environment taking into consideration
The overall purpose of the HyLift-0 project is to develop a first generation HT-PEM / Li-Ion fuel cell system for a class 3 forklift and benchmark this with an existing LT-PEM fuel cell system
The project worked with three key objectives in the roadmap on Danish fuel cell strategy. Optimisation of fuel cell production, an area in which the project succeeded in saving electricity and raw
This project is motivated by the vision of being able to understand and model complex structural mechanisms and failure in large composite structures such as current and future wind turbine blades
The aim of the project is to obtain significant fuel cell performance and cost reductions through component and manufacturing technology development. The project has concentrated on the two key
In the Backup Power segment, the fuel cell units have been developed, certified and delivered. A total of 32 fuel cell backup power systems have been delivered to EnergiMidt. In the material handling
This partnership has developed a model for innovation networks, as well as a website, and a market study was prepared. This study was reproted in four market reports on four product areas and seven
The project aims at developing a meteorological software tool for large wind farm planning. The project is based on data from previous projects on large wind farm shadow effect. The existing tools
The project focuses on a theoretical and experimental study of floating platforms for wind turbines, wave power systems and the relationship between wind and wave power. The project basis is the
The objective is to improve the design basis for large wind turbines by measuring wind and turbulence profiles at high altitude above a flat ground using modern instruments. The project will study
The research has resulted in new PEM-membranes structures both with and without fluor with a wider temperature window and good mechanical strength. The PEM may be used in both hydrogen- and direct
The vision is that the increased research on main wind turbine uncertainties and risk & reliability will lead to less conservative designs and more cost-efficient wind energy. Therefore, careful
The usage of new reinforcement fibre and resin systems allows for novel forms of blade design, cost optimisation and production methods that significantly reduces the production time.