RUNE is short for - Reducing Uncertainty of Near-shore wind resource Estimates using onshore lidars. The key project aim is to reduce the uncertainty of offshore wind resources in Danish near-shore
This project aims at testing the Weptos WEC for the first time in an uncontrolled - real sea environment. This will give the opportunity to check the extensive findings from the previous
New cooling technology and newly developed communication and management solution allows access to untapped reserves the telecommunication companies. Reserves that are already established. The way to
A complete up-scaled version of BioSynergi Process' air-staged gasification-CHP system (300 kW electricity / 750 kJ /s of heat) is ready to start test operation in autumn 2014.The project covers the
The purpose of the project is final engineering, drawing, design, production and installation of a Crestwing prototype close to full scale. It will show its potential and demonstrate its high
Solid oxide electrolysis cells (SOECs) are a promising technology for energy storage and synthetic fuel production and it has a unique potential for grid regulation in the Danish power system. This
A main result of the Low Cost Active House BIPV project is to realise a demonstration campaign with 3 MWp, low cost BIPV solutions in connection to low energy class 2020, energy neutral and plus
The goal of SDVP Connect is to mobilize the Heat Pump ITC-platform, developed in collaboration with Energinet.dk and ForskEL, on the Smart Grid market.
Combining silicon solar cells and high efficiency solar cells into one cost-efficient, high-efficiency solar cell has been a dream of the solar industry for decades. However, differences in the
Grid side converter (GSC) is the key for PV integration. GSCs are still not capable of advanced control features that enable the full control of PV systems with fault ride through, reactive power
The overall target for this project is to develop an industrialized concept for Building Integrated Solar PV-BIPV that visualizes a number of added values, minimizes additional costs and thus paves
The development of evacuated glazings approaches prototype production. Thus the basis for decision-making for commercial production will be created within approx. a year and a half.
The project aim is to develop an integrated SOFC module (standard module) which can be based on the most cost effective materials and manufacturing processes in order to reduce SOFC plant expenses.
This project was a pilot study which had as its main goal the evaluation of the use of a simulation method, based on strategic feedback models, to help understanding the evolution of a competitive
The Danish Energy Agency has renewed the Danish participation in the Implementation Agreement on Energy Technology Data Exchange (ETDE) for another 5-year period from January 26th, 1993.
Coordination of all Danish CADDET activities. Mailing of CADDET Newsletters, brochures and similar material. Organization of CADDET register inputs and liasion activities to the CADDET Centre and
The result of any risk analysis is uncertain, sometimes very uncertain. Despite of this fact, there is still a limited tradition for describing uncertainties, mainly due to the lack of appropriate