Process optimisation is performed at the MaxiFuels pilot plant at DTU in the context of, for instance, membrane distillation of ethanol, separation of the permanent residual fraction from glucose
The project developed a methodology to communicate uniform data on professional laundry machines to decision makers in e.g. the social housing sector and public institutions. The method is a result of
By means of theoretical reports and three specific cases, the project showed how Lean principles can improve energy consulting efficiency, thus making it easier for end-users and energy consultants to
In preparation for an ESCO agreement, the project studied the lighting and ventilation system at Nyrupskolen in Kalundborg. By improving the technical system efficiency, the local authority can expect
The project developed two new LED light sources and systems, emphasising the potential of LED technology for energy savings and lighting quality. An LED light source for display case lighting
The project analysed how advanced statistics can be used to establish multi-parameter sensors/controllers on the basis of the huge amount of data generated by a modern CTS system. A new operations
Further to Elforsk project 337-008, a hydrocyclone pilot plant with a capacity of 8 m3 potato juice per hour was tested at two potato starch factories in Karup and Brande. The 2007/2008 campaign saw
The project developed a tool to optimise interaction between companies and energy saving players. Consisting of an eight-phase model, the tool can probably increase the realisation rate from the
The project took illumination measurements and made subjective assessments of nine fixtures with LED light sources and 13 different LED light sources. The subjective assessments were made by
In the project, the original benchmarking tool on www.tjekskoleforbrug.dk was extended from school buildings to all types of local authority buildings on www.tjekkommunebygninger.dk. The tool uses
By comparing data from remote-read electricity meters in the Syd Energi supply area with personal and residential data from Statistics Denmark, the project tried to determine the savings effect of
This project is a preliminary study where international experience and knowledge about passive air conditioning of buidlings are collected. Typical danish office buildings is analysed to identify the
6-8high-qualitysystemsfor light controltested in theSBi'slight laboratory to identifystrengths and weaknesses.Producers must usethis feedback tosolve some of thetechnical and communications
This project was the framework for a competition on sustainable building in four dimensions (an environmental and energy perspective, as well as architecturally, functionally and commercially) for a
The Castor plant’s gasification reactor is developed to gasify wood pellets instead of wood chips, and an aesthetic and technically efficient design of the plant is developed for adaptation into a
The durability and performance of fuel cells have a major impact on the most important challenges facing fuel cell commerciallization including cost, mass production, system integration, functionality