Two DMFC generator modules 0.5 kW and 1.0 kW have been constructed for demonstration in UPS and battery charging applications. The overall goals defined in the Danish “DMFC Road Map” for 2008 has been
The demonstration plant includes the following elements: Container buildings for control and monitoring as well as housing of the process equipment. Two fully automated PEM-CHP fuel cell units of 2 kW
Under the Danish-Canadian project, Dantherm Power developed a fully integrated UPS system based on Canadian-based Ballard’s air-cooled LTPEM fuel cells. Eleven UPS units were installed to support
A novel concept for preparation of sulfonate containing fluorinated block copolystyrenes have been developed based on initial ATRP of fluorinated styrene monomers. The strategy depends on well defined
The project aimed to improve stack technology for solid oxide fuel cell stacks (“SOFC”). The project developed and tested several improved stack components, including improved glass seals and
The project goal was to develop stack materials, components and stack technology, including industrially relevant production methods. Further, the project was to perform tests and demonstration of
SERC was carried out during the period from primo 2007 until end of 2012 I cooperation with leading Danish and International research institutes plus a wide spectrum of industrial partners. The
The main activities of the project were developing improved SOFC electrodes, cells and interconnects through careful characterizations in interaction with new fabrication methods. Major break-throughs
This project is the first phase of a project consisting of three phases, which aims at demonstrating micro CHP based on Danish fuel cells. The project will test three different fuel cell technologies
It is a common opinion that water electrolysis is an available and mature technology, which is not wide spread because it is too expensive compared to steam reforming of hydro carbons. As a
The DK-SOFC b line is targeted towards: 1) decrease of the operation temperature without increasing the area specific resistance, 2) increase of the ro-bustness of the cell, 3) better understanding of
The goal of the project was to develop and demonstrate a 3 kWe DMFC generator aimed for Uninterruptible Power Supply. How-ever, a detailed concept evaluation based on the present Danish DMFC stack and
The goal of the project is to develop and test small (2 kW) reformers for converting natural gas into hydrogen for use in Proton Exchange Membrane (PEM) fuel cell cogen units for single-family houses
The project co-financed Danish participation in a European partnership under the 6th framework programme to test whether gas from thermal biomass gasification can be purified sufficiently to be used
The aim of the work is to participate in the IEA Implementing Agreement on Hydrogen (IAH), in order to stimulate and co-ordinate hydrogen activities in Denmark. The work includes: 1) Participation in
The project co-financed Danish participation in a European partnership under the 6th framework programme to test whether gas from thermal biomass gasification can be purified sufficiently to be used
The main purposes of the project were 1) to develop new catalyst materials by applying ‘flame spray deposition’ (FSD); 2) to optimise state-of-the-art MEA materials and electrode structure; 3) to